Total Cost Saving :
0.00%
|
||||
BEFORE (%) |
AFTER (%) |
|||
COST SAVING | 0.00 | |||
TOOLING COST | 0.0 | |||
OVERHEAD | 0.0 | |||
MACHINERY | 0.0 | |||
MAN POWER | 0.0 | |||
RAW MATERIAL | 0.0 |
Total Cost Saving :
0.00%
|
||||
VALUE | BEFORE (%) |
AFTER (%) |
||
COST SAVING | 0.00 | |||
TOOLING COST | 0.0 | 0.0 | ||
OVERHEAD | 0.0 | 0.0 | ||
MACHINERY | 0.0 | 0.0 | ||
MAN POWER | 0.0 | 0.0 | ||
RAW MATERIAL | 0.0 | 0.0 |